• Scope of work involved the fabrication of the module from the ground up, related specifics include:
    • Receipt, OS&D, inventory and storage of owner supplied matierals
    • Chemical cleaning & treating of contaminated SS piping
    • Abrasive blasting & epoxy coating of SS pipe with Scotch Coat 323i
    • Structural steelĀ  & piping fabrication and erection
    • Electrical installation including heat trace
    • Architectural siding installation
    • Structural steel coatings
    • CQPM turnover documentation

Related Posts

Leave A Comment

Your email address will not be published. Required fields are marked *