WORLD-CLASS FABRICATION FACILITY
NANA Construction’s fabrication facility is one of the largest and most modern in Alaska, with multiple buildings on 32+ acres at Mile 2.1 Big Lake Road, just north of Wasilla, Alaska.
Large industrial modules manufactured at this strategically located facility reduce shipping costs and transport times to the North Slope by up to two days compared to modules manufactured in Anchorage.
NANA Construction’s fabrication facility features:
Building 1
Blasting, Coatings and Tank Fabrication
12,480 sf, 60’ x 208’ with three overhead cranes
Building 3
Module Assembly
28,000 sf, 120′ x 240′ with two full fabrication/assembly bays, four 10-ton overhead cranes, 508a electrical panel shop, SS fabrication shop with independent OH cranes and HVAC, indoor heated materials storage
Building 4
Administration Building and Training Room
4,800 sf, 40’ x 60’ with two stories, change area and offices
Building 5
Modular Manufacturing Facility
54,000 sf, 200’ x 260’ with overhead cranes
NORTH SLOPE BASE OF OPERATIONS
NANA Construction’s North Slope base of operations sits on five+ acres of land at the Deadhorse Airport. The facility includes a five-ton-capacity overhead crane and a 7,200-square-foot shop area for material storage and fabrication, as well as a 1,600-square-foot vehicle maintenance bay.
Proximity to North Slope construction projects provides our clients cost savings and quick response times for the immediate, evolving requirements of a job or project.